View source
for
GebhardtRuss241
Jump to:
navigation
,
search
[http://realstone.net.au/ stone wall cladding] - Stone is a defining feature in almost any room and adds instant solidity, luxury and grandness whether you determine to cover all your walls with marble or simply use it for a simple round basin. Although stone is definitely a tough material once installed, the self -builder must always take special care to see the delivery and installation process runs smoothly. Dirt from foot traffic or a careless knock from the power tool could lead to a costly repair bill. Keep the room clean and tidy, check larger items like a stone bath, can fit by way of a door entrance (you may have to leave off architrave/frames to permit extra room). The weight of stonework also means that it should be planned in at the home's design stage as load-bearing joists might need to be increased in size or even doubled up to cope with the weight. Preparing floors A brand new concrete screed is the perfect base for stone floor tiles, as long as the concrete is fully cured. New concrete needs to be at least six weeks old and show no signs and symptoms of remaining moisture. You may need to use a thin screed of self-leveling compound to balance out any low spots. Again, leave the compound to completely cure before tiling. In case you are working on new flooring grade T&G chipboard panels, check the edges are fixed at 300mm centers and tile on the surface with a flexible adhesive all the trade adhesive manufacturers have powder mixes meant for timber flooring. For any restoration project, never try to tile directly onto old floorboards. Instead, develop a new sub-base with 15mm exterior grade plywood, screwed down at 300mm centers with stainless screws. Stagger the board joints and adjust any uneven floorboards before starting work. Coat the boards with thinned PVA to seal the wood. Old cork and vinyl carpeting should always be pulled up. Look into the floor beneath is dry, flat and powerful enough to support the newest stone tiling. If you're confronted with quarry or ceramic tiles, you'll be able to tile directly on the surface as long as there aren't any signs of damp, cracking or movement. Prime the old tile surface to provide the adhesive a key' for bonding and make set out your new tiles in order that the grout gaps aren't aligned using the existing floor. The exceptions are shower or wet room walls that ought to be lined with a waterproof lining panel to offer the tile base. Installing [http://realstone.net.au/ real stone] tiles The porous the surface of many natural stone products means they are more vulnerable to staining than glazed tiles. Check the manufacturer's instructions for precise laying instructions and constantly seal the surfaces of the tiles, if recommended, before fixing it's all too easy to spill adhesive over a tile and not notice. Open the tile packs and work from several packs to evenly distribute any color variation between packs. Tiling a floor With a little planning and careful aiming, dramatic stone flooring can be as easy as tiling a wall. There's usually less cutting around awkward shapes compared to wall tiles and you are not fighting against gravity. Remove skirting boards and door thresholds before starting work. In the aiming stages, it's important to guarantee the tiles look directly from the entrance to the room. Often walls are bowed or away from true so check your measurements in many places along each wall. It is slightly more but a powder mix rapid-setting adhesive is the greatest option for most floors. It's going to reach full strength within 24 hours so the remaining portion of the build isn't delayed. Finally, plan in any movement joints required. They're 6/8mm wide and full of flexible filler that allows for movement and prevents tile damage. These joints are typically installed where flooring abuts walling, steps, columns or any other hard objects on large floor areas and over structural movement joints. Floors under four meters between walls will not normally need movement joints. STEP-BY-STEP 1 Get the mid-points of the two longest walls and snap a chalk line throughout the room between these points. Repeat for your shorter walls but adjust the fishing line so that it passes from the center of the first line at right angles. Try to work with as many whole tiles as you can, even if it means adjusting the grout line width slightly. 2 Lay tiles over the two lines to see if they look right from the threshold. If any gaps in the walls are not even half a tile wide, shift the fishing line across to make much more of a gap. Also move the guide lines to ensure that tiles around a dominant feature (e.g. a hearth or French windows) are symmetrical where there are whole tiles in the doorway. 3 Spread about one square meter of tile adhesive/grout into one of many right angles produced by the two crossing chalk lines. Scrap the notched fringe of the trowel across the mix to create ridges of the same thickness. 4 Lay the initial tiles along the edge of the longest center line. Gently press the tiles into position, making sure they also fall into line with the other center line. Add plastic spacers each and every corner to keep them a similar distance apart for grouting. 5 Work outwards in the middle of the room until you have laid all the whole tiles using one half of the floor. Make use of a spirit level to check the tiles are at exactly the same level. Now move across for the other side of the longest center line and add the rest of the whole tiles. Leave to create for 24 hours. 6 Utilize the tile cutter to trim the extra edge tiles to the right shape. Look at the space at each side in case the walls are uneven and don't forget to allow for the grouting gap. Always wear goggles and gloves when cutting tiles. 7 Leave the adhesive to set for at least 12 hours, then grout involving the tiles with the adhesive/grout. Force the mix into the gaps using a squeegee, working from side to side and up and down the tiles. 8 For wide joint lines, run a piece of hosepipe over the grouting surface. Wipe off any grout from your tiles with a damp sponge, before it sets hard. Wall tiling Gemstone tiles add a touch of luxury to any room. There's no special trick to finding out how many tiles you will need, just measure the height and width with the area and multiply these together to provide the area to be tiled. Divide this figure through the area of a single tile (e.g. a 10x10cm tile has an area of 100cm) to give the quantity of tiles you need. Add 10 % for cutting and wastage. Installation is the same as for ceramic tiles however you will need an electric tile cutter using a diamond wheel and also the capacity to tackle your chosen depth of tile. Most natural stone is easier to reduce than ceramic. The additional weight of real stone ought to be considered use strong battens, a minimum of 50mm wide and screwed towards the wall, to support the bottom line of tiles. Work with a saw tile to chop a tile to match around an awkward shape for instance a pipe or architrave. If you wish to cut a curve, to fit around the side of your basin for example, produce a card template exactly the same size as the tile. Make cuts at around 10mm spacing along the curve edge and press the template into position. Trim the 10mm strips to match exactly around the curve and transfer this shape to the tile. Remember to leave at least 2mm for grouting. STEP-BY-STEP 1 In order to avoid lots of cut tiles or an unbalanced look, constitute a tile gauge (a batten with all the tile dimensions and grout spaces marked across the edge) to plan the positions of the tiles so that the tops from the last row of tiles under any window is going to be exactly flush using the ledge. You may find you will have to cut the bottom row of tiles. 2 Screw a batten to the wall along the line you have marked. Check with a spirit level that it is horizontal. Fix an additional upright batten along the left side of the area to be tiled. Again, make use of a spirit level to make certain it's vertical. 3 Spread the adhesive/grout over most a square meter from the wall, starting inside the corner made by the two battens. Use the notched side from the spreader to form even ribbons of adhesive. This is particularly important for heavy stone tiles. As a rule of thumb, 6mm notched spreaders bring walls and 10mm versions for floors. 4 Start to tile, pressing the tiles gently onto the wall and sliding into position unless you see adhesive squeeze out around the sides. Press spacers into each corner and hold a spirit level across the tiles to see if they form an appartment surface. Continue to tile, taking care of about a square meter at any given time until you've fixed every one of the whole tiles. Clean off adhesive from the tile surface when you work. 5 Next, lay tiles along the sides and front from the window reveal so that they cover the edges of the wall tiles. Wipe off any adhesive before it's got dried with a damp sponge. 6 Leave the splashback to dry fully before taking out the timber battens. Now cut the tiles to match into any gaps at the end of the splashback and at leading and sides from the window reveal. Fix in place. 7 When all the tiles are fixed, leave to dry. Force more adhesive/grout to the gaps between the tiles with a squeegee. Wipe off all the excess grout with a damp sponge, rinsed out regularly in clean water. When the surface is dry, polish with a dry cloth. 8 To form a flexible waterproof seal new tiles plus a worktop, run a bead of waterproof sealant around the bottom of the tiles. TIPS In case you are tiling around an acrylic bath, half fill with water to create the rim flex to the maximum extent before filling the gap with a bathroom sealant. Make screw holes for bathroom accessories with a masonry drill bit. To prevent the bit slipping and damaging the top, stick some masking tape within the area to be drilled. Buy all of the tiles you will need at one time if possible to avoid any differences between batches. In order to form a pattern, draw a plan of the room on graph paper to ensure the pattern will appear in proportion and symmetrical. To tile a room that has to be used everyday, tile half of the area at any given time so you can still walk over the bare floor even though the tile adhesive sets. If you learn you are working slowly as well as the adhesive is beginning setting, only spread around half a square meter at any given time. It's essential the adhesive is still wet when the tiles are increasingly being fixed. Fireplaces Stone Fireplaces certainly are a defining feature for a lounge or living area, making the perfect frame with a wood, coal or gas fire. Obviously, any chimney linings needs to be pre-installed in your self-build project and the surround really does come on the final stages of the project. Most companies give you a design and install service that's definitely worth the money for such large and expensive objects. Otherwise, check your builder is happy to battle the job. It may need extra lifting equipment however the installation process isn't complicated. It is possible to choose anything from the clean lines of a contemporary fireplace to a reproduction Regency style or make contact with an architectural salvage yard to get a genuine period piece. Most yards will also undertake restoration focus on stone and marble fireplaces. Baths and basins Baths, basins and washstands can be either stone resin or solid stone. There exists a wide range of colors provided by off-whites to reds, browns and blacks. Remember the loading over a suspended floor baths can weigh from 200 to 500kg or more. As well as the luxury of a solid stone basin, a few of the modern designs can also be breathtaking, with open wave forms, travertine mosaic and deceptively thin slab designs. Worktops Granite is regarded as the popular of the natural stonework surfaces. You can clean and contrasts well with lighter wood carcases. Marble and limestone look good but are softer and can scratch or stain. When you plan your kitchen, ensure the runs of floor cabinets can withstands weights approximately 90kgs per square meter average for a 30mm solid granite top. You can also specify 40mm tops, produced from two 20mm layers with a ply central insert to lessen the weight. Your kitchen supplier might need to alter the design and add extra support around sink cut-outs and appliances. The suppliers will even need a clear work space so all sinks and hobs should be removed and kept free from the work area. If you're able to, don't install the wall sockets until following your worktop is fitted this can avoid any accidental damage because the stone is slid in place over the units. With respect to the shape and size of each factor, the suppliers may suggest extra joints in solid granite worktops since the grain structure can be very vulnerable to cracking if there's any stress over longer lengths or around narrow cut-out areas. Make sure you order matching granite up-stands for that walls. These are around 100m high with polished surfaces and edges. Color-matched silicone sealant is utilized for the jointing. As with sanitary items, composite quartzite can reduce the price of the kitchen but nevertheless give some of the solidity and feel of the real stone. Additionally, it has the advantage of grain consistency plus a wide range of solid reds, blues, greens plus more neutral tones. Maintenance and cleaning [http://realstone.net.au/ stone wall] - Keep a copy with the care and maintenance instructions provided with your stonework as sealants and care procedures vary. Granite surfaces for example worktops don't need an excessive amount of specialist cleaning since the surface doesn't absorb stains in the same manner as a softer travertine stone. Wipe up any spills as quickly as possible, especially liquids such as acidic juices and alcohol. Fine grit is the big enemy of stone flooring as ground in particles cause striations than eventually dull the surface. Use a mop, soft brush or vacuum to get up the dirt. A neutral pH detergent and hot water will remove grease and other light stains but ensure the floor is dried having a soft cloth to prevent a film build of residues. Stone should just have resealing every 3-5 years or so and some products will never need resealing. After installing any gemstone, it's essential to clean up any mortar/adhesive residue right away as the resin-based adhesives bond' the stone surface and therefore are extremely difficult to clean up when cured. For kitchen and bathroom installations, avoid using any wax or soap cleaners for around the first six weeks. Otherwise, the stone pores can become clogged and restrict the evaporation in the mortar/adhesive.
Return to
GebhardtRuss241
.
Personal tools
Log in
Namespaces
Page
Discussion
Variants
Views
Read
View source
View history
Actions
Search
Navigation
Home
Program
Papers
Challenge
Call For Papers
2nd Call For Papers
Program Committee
Organizing Committee
Toolbox
What links here
Related changes
Special pages